One thing that I have to do is focus on working little by little every day.

The problem is that I always want everything to be done asap.

It’s the feeling of instant gratification. 

Or to be specific, the desire to experience that feeling of instant gratification.

Because I’m working on multiple projects, all of which with long timeframes, I want all of them to be finished.

But I think that all of my projects have long timelines, and I need to just set a reasonable and realistic schedule and stick to it.

So tomorrow, 6/25, I have a day off and I’m going to get a lot of stuff done and plan out my schedule. 

Well, I already do have a schedule, but I think I need to add more and make it more detailed.

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes:

<a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>